LENS History 2010


Go To year:   2013  •  2012  •  2011  •  2010  •  2009  •  2008  •  2007  •  2006  •  2005  •  2004


January 2010
Klystron beam switch tube new assembly version one installed.

April 2010
New Target design installed. This design has the beryllium target normal to the proton beam and a thickness of 1.2 mm so that the protons are stopped in the cooling water and not in the beryllium.

July 2010
Target failure water impurities build up on the target back side.

October 2010
Target water cooling system upgraded with DI filters

October 2010
SANS frame overlap chopper installed.